REEL-Alesa materials handling equipment : Refinery reached full capacity

REEL Alesa high performance handling equipment contributes to the region’s largest alumina refining operation

 

REEL Alesa is proud having participated to EGA’s Al Taweelah alumina refinery, which reached mid-July 2020 full ramp-up to 2 million metric tons per annum.

It marks a significant milestone for the region’s largest alumina refining operation.

REEL Alesa delivered on a turnkey basis high-performance materials handling equipment including reclaim systems from the refinery :

allowing a full ramp-up achievement after only fourteen months of production, without a single working hour lost to injuries on the site.

 

Join a dynamic group!
Reel, we hire all over the world

WNE 2020 postponed to 2021

REEL-Alesa materials handling equipment : Refinery reached full capacity

REEL Alesa is proud having participated to EGA’s Al Taweelah alumina refinery

EDF Innovation Challenge : Archimedes’ buoyancy at REEL’s service

How to handle a 17-ton rack with a 2-ton overheadcrane?

REEL to support NALCO during INALT 2020

discovering our latest equipment at real scale with REEL VR Station.